Houses in Spain

Spain certainly seems to have different building regulations to what we’re used to in the UK, even more so when you buy a cortijo on a Finca.

Many cortijos were built without any permissions or sign offs at the end of the build – think along the lines of building a shed in your garden!

Most houses don’t have a damp proof course, so suffer from some damp and paint peeling off the cold cast walls.

When we bought this cortijo were went in eyes wide open and knew what we were buying – and also accepted that some work would need to be done to live in it all year round. And I think we’ve been pretty lucky – the house has been way better than we thought it would be. Some of the electrics and plumbing have been ‘interesting’ to say the least, but Rog is handy in both of these areas so with a bit of hard work and some choice swear words, we’ve had everything working ok.

But there, in the back of our minds was ‘what’s going on under the shower tray?’ We took the decision to leave it well alone while it’s all been working ok.

But a couple of weeks ago we had a problem with the hot water – there was literally a trickle coming out of the taps. Knowing the water here has loads of calc we called Emilio, our gas man, to clean out the boiler pipes with the special diluted acid to get rid of the calc. But then disaster struck!

We turned the hot water back on and even though the taps were off, we could hear water running in the house – there was a leak somewhere. The leak had been plugged by the calc so now the pipes were clean, the leak could flow freely! At which point I buggered off to the UK leaving Rog to sort it out!

It turns out that the water pipes were laid and then the concrete floor was poured. So Rog had to dig down and around to find the leak, taking out the shower as part of the process. He had to dig fairly deep …

This is under what used to be our shower!

So the good news is we do now have running hot water, but the bad news is we have no shower or bath! So, we called our builder (also called Emilio!), who once again looked at something in our house and simply said ‘Madre Mia!’. The situation has forced our hand to get the bathroom totally re-done (which was on the list for some point in the future). We’ve been and bought all new tiles and new fixtures and fittings for the bathroom now in case we go back into lockdown like other countries in Europe, but Emilio can’t do the work for a month … it’s going to be a very long month I think!

At this point it’s better to just rip everything out and start again. We’re bringing the water pipes above ground just in case we have another leak in the future!

We’re turning it into a wet room and have chosen tiles we actually like 😂. It’ll all be worth it when it’s done!

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s